August 27 :: Back Left Foundation molds up, ready to pour. |
|
 |
September 7 :: Back Right Foundation complete, the grey paint marks the future dirt line. |
|
 |
September 14 :: Back Right Filled and graded. |
|
 |
September 28 :: Front Left Captain! There be walls here! |
|
 |
October 5 :: Front Roof added, glad they remembered. |
|
 |
October 13 :: Front Starting to look like a house. |
| October 13 :: Back Left
|
|
 |
October 18 :: Front Pillars, and some garage and window trim. |
| October 18 :: Back Sky lights and shingles on the back, air conditioners are in (not shown) |
| October 18 :: Back Yard A view of our back yard. mmmmud! |
|
 |
October 25 :: Front Siding is in place, porch is almost finished |
| October 25 :: Back Siding is in place, final window and french doors showed up |
|
| November 2 :: Interior - Living Room Not much changed on the outside, so here's the living room. Gotta love those windows. |
|
| November 22 :: Interior - Kitchen You can almost smell that turkey and stuffing! The cabinets and tiles are in, next will be the appliances and the counter tops. |
| November 22 :: Interior - Living Room This shows the fireplace and newly installed mantle. |
| November 22 :: Interior - Upstairs Hallway This picture shows the upstairs hallway which over looks the living room. |
| November 22 :: Interior - Master Shower Here you can see a partially completed master shower with tiles installed. |
| November 22 :: Front Newly added trees and shrubs really draw the eye away from the sink hole which is our front yard. |